By utilizing the low valley electricity price period for energy storage and the peak period for discharge, we can achieve peak shaving and valley filling of electricity, assist in peak shaving of the power grid, and reduce electricity costs; As an emergency backup power source for factories, industrial parks, and data centers, it can respond to sudden power outages and restrictions in the power grid, ensure the continuous operation of core equipment, monitoring systems, and lighting facilities, and avoid economic losses and operational interruptions.
